









Description
V4.94 Digiprog III Digiprog3 Odometer Master Programmer Entire Kit
Top 8 Reasons to Get Digiprog III:
Top 8 Reasons to Get Digiprog III:
1. Newest Version: V4.94
2. Add more car models on the basic of V4.88
3. Worldwide leader in digital speedo programming and correction software.
4. Support Multi-language: Deutsch/ English/ Espanol/ French/ Portuguese/ Italiano/ Turkish/ Nederlands.
5. It has years of experience in digital vehicle engineering.
5. It has years of experience in digital vehicle engineering.
6. Its quality standards are second to none.
7. Power-On Password: 1
8. There are ST01/02 and ST04 Adapter in the Package Already, No Need to Buy Them Alone
8. There are ST01/02 and ST04 Adapter in the Package Already, No Need to Buy Them Alone
V4.94 Add Model List:
Audi
-A3 new version
Ford
-F150 24C16
-Falcon 24c02
Mercedes
-W176 new version
-W204 new version Diag
-w212 new version Diag
Opel
-Insignia new version
-Astra new version
V4.93 digiprog 3 Odometer programmer:
For Audi
A3 Diag new version
A6 Diag new version
A8 Diag new version
For Mercedes
R 172 Diag new version
R 231 Diag new version
W 212 Diag new version
For Ford
Kuga Transit
For VW
Amarok Polo Johnson
V4.94 Digiprog 3 Features:
1. Service interval adjustments and settings
Assyst processing
Fault memory read-erase
EEPROM programmer
Integrated PC communication
Some Important Tips for Using Digiprog 3:
1. Always connect the Eeprom to the ST01 or ST04 before you connect to the DigiProg this will avoid Electro static feedback (ESD).
2. Never solder the connections whilst the lead is connected to the programmer, this will damage the DigiProg.
3. Always keep your DigiProg in its case when not in Use & keep it in a dry environment at night (don’t leave it in the trunk of your car) If you are using solvents to remove lacquers’ from Eeprom’s ensure that they are cleaned 4. completely as the solvent can damage the clips.
Digiprog 3 Menu:
1. EEPROM Menu
The first option on the main menu is the Eeprom menu. Reading, writing and saving Eeprom information is all done using this menu. A more detailed guide to using this menu follows later on in the introduction.
2. CAR/TRUCK Menu
This is the menu you will use for correcting and reprogramming vehicles. Manufacturers are set out in alphabetical order and models of vehicles are set out in a simple sub-menu format.
3. Motorcycle Menu
This menu is the same as the CAR/TRUCK menu but is used for reprogramming motorcycles.
4. Special Functions Menu
The special functions menu is for use only by official DigiProg dealers.
5. Setup Menu
This menu is where settings on your DigiProg can be changed. Language, password, brightness, volume, and the time/date can all be set and changed in this menu. You can also change whether your machine is working in kilometres or miles.
Using the EEPROM Menu:
On some of the vehicles you will come across, an eight pin Eeprom chip will be used to store the vehicle data. These chips hold vital information from the vehicle such as ignition and immobiliser codes. Loss of this information could result in anything from minor faults, to major faults involving the vehicle not starting and having to be taken to the main dealer. This is why it is very important to read and save the original information from the Eeprom before programming, this way if any errors do occur you can always return to the point you started.
The process of reading and saving this information is very simple. The Eeprom chip itself will have a mask number printed across the top of it, for example a widely used chip is a 93C46. You can connect the chip to your DigiProg by using adaptor ST01 or ST04. Most chips are surface mount eeproms which will use ST01, but the larger DIL chips will use ST04.
Package List:
1pc x Digiprog3 Main Unit
1pc x OBD2 Cable
1set x Cables and Adapters
Digiprog III V4.94 Screen Display:

Reviews 10
- #1 Juan Carlos Guerra Ahumada
Feb 9, 2021 - Got, installed, proga found it, from the internet is untied, tomorrow i will check again, while i like everything
- #1 Vclav Ptnk
Jul 9, 2020 - OK, TOP seller, good supporrt...
- #1 jamie wiseman
Mar 9, 2021 - Everything is fine, it came quickly
- #1 Valnei Ferle
Jun 9, 2020 - A professional approach, I recommend the seller
- #1 port city nissan auto group
Mar 9, 2021 - all perfect ! Items came to me 3days! I would buy it again, from this seller
- #1 Silvio Marcelo Catardi
Feb 9, 2021 - I received the Item within 5 days. So the shipping was much faster than expected. Quality is very good and it works just fine. On the CD is a little gift of usable Software. Would buy here again.
- #1 Isaac Romero
Jan 9, 2021 - Everything is super, very fast. from moscow to peter 2 days. p The parent put a tester for the brake as a gift. Many thanks to the seller, that's what quality and speed means. this V4.94 Digiprog III Digiprog3 Odometer Master Programmer Entire Kit Add More Car Models is good quality, working very well
- #1 ESSE Dominique
Feb 9, 2021 - Excellent seller já me turning client
- #1 darci lopes de lima
Nov 9, 2020 - Is ok!
- #1 sergio alayon
Nov 9, 2020 - Fast delivery, the machine good quality. Investment zwróciła after first use. Recommend.
Recommend Items
- US$49.99
- US$99.00
- US$197.00
- US$178.75
- US$1,234.00
- US$669.00
- US$194.00
- US$149.00
- US$219.99
- US$2,599.00
- US$269.00
- US$145.00
Special Items
- US$9.90
- US$149.00
- US$119.00
- US$17.99
- US$278.00
- US$199.00
- US$109.00
- US$2,479.00
- US$1,028.99
- US$54.99
- US$149.00
- US$147.00






































